Daeyee Engineering is Different
Overview
Our company advances alongside you, leading the formwork industry and focuses on growth of both our client and us. DAEYEE is constantly provide a safer and more efficient construction environment by placing trust at the core of its values with our clients. We look forward to growing together with you and creating a successful future.

Features
Table Form System | MS System | |
---|---|---|
Integrated Product Solution
![]() |
Individual Product Solution
![]() |
|
Applicable Facilities & Areas |
APT., Knowledge Industry Complex, Data Center, Complex Building |
PIT level, PILOTI level, Evacuation level, TP Slab, TG Beam |
Sequence | Multi-Support > Plywood with Girder (Integrated Product) | Multi-Support > Truss Brace > Scaffolding |
Reusability | Integrated Module Reusability | Individual Items relocation, Reusability |
Early Disassembly | Can be disassembled after 3~4 days (14 Mpa) then reused to another zone |
Can be disassembled after 3~4 days (14 Mpa) then reused to another zone |
Major Characteristics |
|
|
Table Form System | |
---|---|
Integrated Product Solution
![]() |
|
Applicable Facilities & Areas | APT., Knowledge Industry Complex, Data Center, Complex Building |
Sequence | Multi-Support > Plywood with Girder (Integrated Product) |
Reusability | Integrated Module Reusability |
Early Disassembly | Can be disassembled after 3~4 days (14 Mpa) then reused to another zone |
Major Characteristics |
|
MS System | |
---|---|
Individual Product Solution
![]() |
|
Applicable Facilities & Areas | PIT level, PILOTI level, Evacuation level, TP Slab, TG Beam |
Sequence | Multi-Support > Truss Brace > Scaffolding |
Reusability | Individual Items relocation, Reusability |
Early Disassembly | Can be disassembled after 3~4 days (14 Mpa) then reused to another zone |
Major Characteristics |
|
Application Effect
-
Safety 01
- Ensures safety by eliminating the need for working at heights.
- Installing and dismantling temporary supports reduces direct worker exposure, thereby ensuring safety.
- Safe vertical movement is possible via stairs or vertical ladders. (MS Solution)
- Work and material dismantling can be carried out from scaffolding. (MS Solution)
- Installing scaffolding prevents workers or materials from falling, reducing injury risks. (MS Solution)
-
Improved Working Environment 02
- Securing the lower workspace allows for comfortable and safe management.
- Possible to store materials in the lower space.
- Easy Supervision.
-
Cost
Reduction 03- Faster construction enhances cost-effectiveness.
- Installation and dismantling with fewer personnel increases overall cost efficiency.
- Excellent reusability leads to cost reduction.
-
Quality Improvement 04
- Using high-load supports allows ample space both above and below.
- Vertical unhindered space movement above and below due to secured space.
- Inspection of formwork, rebar, and equipment is easy on site.
- Immediate materials replacement if materials are found to be defective.
-
Reduced Construction Time 05
- Maximizes usage of filler-support.
- Early disassembly of formwork to allow subsequent processes to proceed more quickly.
- Fewer secondary materials enables faster installation and dismantling.
About
DAEYEE Engineering provides efficient and safe formwork solutions.
By employing the Table Form Solution and the MS Solution, we achieve enhanced safety, reduced construction time, improved curing quality, a better working environment, and cost savings.